PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Started installing duct work hangers at the 2nd floor Facing South (800x600).jpg Started installing wire mesh at the 3rd floor Facing North-East (800x600).jpg Started repairing the interior concrete stairwell -5 (800x600).jpg Continued layout for the interior framing at the 2nd Floor Facing North (800x600).jpg Installed pour stops around the elevator 1,2,3 shaft (2nd Floor) Facing South-West (800x600).jpg Poured concrete at the slab on grade column diamonds Facing South (800x600).jpg Started bathroom roughing at the 1st floor Facing North (800x600).jpg
Previous pageNext page Installed pour stops around the elevator 1,2,3 shaft (2nd Floor) Facing South-West (800x600)
Installed pour stops around the elevator 1,2,3 shaft (2nd Floor) Facing South-West (800x600)